United Power Partners Logo
stock-solar-ground-credit-SPW.jpg

HSGS-Ameresco to install 700-kW solar + storage microgrid at White Sands Missile Range

HSGS-Ameresco, a joint venture certified as a Service-Disabled Veteran Owned Small Business (SDVOSB) by the Small Business Administration and the Department of Veterans Affairs (VA), announced that it has been awarded a contract to install a microgrid system at the White Sands Missile Range (WSMR), the Department of Defense’s largest open-air military test facility in New Mexico.

The new microgrid system is for several of the base’s potable water wells and is designed to include a new 700-kW solar PV array, a 500-kW natural gas generator and a 500-kW battery energy storage system. The system is designed to provide 14 days of power to energize the water wells in the event of a power outage, supporting critical missions at the Army Research Lab, Material Test Directorate, fire department and a Fort Bliss power projection platform.

“We are excited to implement this project to enhance the reliability of WSMR’s energy system,” said Dave McNeil, president and CEO of HSGS-Ameresco. “This diverse solution set will strengthen the base’s energy and water resilience, so that it is no longer dependent on a single source of power.”

The scope of the project also features updated electrical panels, transformers and controls; a fiber optic communication line, a fire alarm system, meters, cyber security measures, anti-terrorism measures and security fencing, among others. HSGS-Ameresco will provide all supervision, labor, materials, equipment, supplies and transportation necessary to perform the microgrid project.

“We’re thrilled to have been selected as a partner on this project for a site that is so important to our national security,” said Nicole Bulgarino, executive VP, Ameresco. “This microgrid system is designed to enable the base to provide continuous power during a loss of utility event for wells on site that provide critical water supply to the installation.”

Construction is set to begin in December 2022 and is expected to reach completion by late 2023.

News item from HSGS-Ameresco

GOODBYE OLD WAYS

It’s okay to break tradition. Today’s electricity needs are more sophisticated than ever, making traditional power a thing of the past. Switching to solar helps you get with the times while saving the planet.

GREEN CONSCIOUSs

Traditional power has adverse environmental effects from the coal and natural gases combusted during production. Solar offers all of the power with no extra cost and no harmful polutions..

POWERED BY THE SUN

Rather than digging up fossil fuels, solar energy is clean power from the sun - a renewable fuel source that won't go out in our lifetime. Every kW lowers your carbon footprint by over 3K pounds annually.

Share this post

DON’T MISS OUT!
Subscribe To Newsletter
Be the first to get latest updates and exclusive content straight to your email inbox.
Stay Updated
Give it a try, you can unsubscribe anytime.
close-link

Let's Work Together

Complete the form below and we will reach out right away to connect about all of your Solar needs!